An upgrade project should retain useful equipment while addressing measured bottlenecks and interface constraints. Modular sections allow cleaning, milling or finished-product capacity to be expanded in stages.
Upgrade approach
- Record the existing process and actual operating data
- Identify capacity, quality and maintenance bottlenecks
- Confirm mechanical, electrical and control interfaces
- Plan installation around the available shutdown window
Required information
Prepare the existing equipment list, process flow, workshop dimensions, control system, production records and planned capacity target.